1. PARTIES AND SCOPE OF WORK
McDaniel Roofing, LLC. (hereafter called “Contractor”), shall mean the company performing the Work. “Work” means that specific services to be performed by the Contractor as set forth on page 1 of 4 of this agreement or in any agreement between the Contractor and client. “Client” refers to the person(s) or business entity ordering the work to be done by Contractor and shall be responsible for the payment thereof. If the Client is ordering the work on behalf of another, the Client represents and warrants that the Client is the duly authorized agent of said party for the purpose of ordering and directing said work. Unless otherwise stated in writing, the Client assumes sole responsibility for determining whether the nature of the work ordered by the Client is adequate and sufficient for the Client’s intended purpose. In performing its Work, the contractor shall be entitled to rely on the work of third parties, the representations of Client and the public record and shall be under no obligation to verify any of the foregoing. The ordering of additional service and/or materials from contractor beyond the scope of the Work shall constitute acceptance of the terms of these General Conditions as to such additional services and/or materials.
2. RIGHT OF ENTRY
The client shall provide rights of entry for Contractor and/or their representatives and necessary permissions in order for Contractor and/or their representative to complete its services.
3. CHANGES
3.1 Unless otherwise specified in writing, the price for the work is based on the understanding that all structural members and other components are in fact in sound condition. If any conditions are encountered that are not currently visible, Client agrees to pay Contractor additional compensation that may be necessary based upon Contractor’s normal rates and as agreed to in writing by both parties.
3.2 Any alteration or deviation from the scope of work involving extra costs will be executed only upon written agreement signed by both parties, and will become an extra charge over and above the estimate.
3.3 Client agrees that Contractor has the right to substitute materials with equal or superior quality materials should the materials listed in the description of the work become unavailable for any reason. Contractor has the right to make such substitution without notice to or permission from the Client.
4. SCHEDULING OF WORK
If the Contractor is required to delay commencement of the Work or if, upon embarking upon its Work, Contractor is required to stop or interrupt the progress of the Work as a result in changes in the scope of Work requested by the Client, to fulfill the requirements of third parties, strikes, accidents or other interruptions in the progress of construction, or other causes beyond the direct control of Contractor, additional charges may be applicable and payable by the Client and the approximate completion date of the Work shall be extended to take into account the period of delay. Contractor shall not be liable for any delay damages. Any delays caused by any event or events beyond the control of the contractor do NOT constitute abandonment and are not included in calculating timeframes for payment or performance.
5. HOMEOWNER / CLIENT ADVISORY
5.1 Most roofing, siding, and exterior renovation jobs may involve major demolition of materials and minor disturbances may occur. Contractor will NOT be responsible for any interior damages and advises the client to remove all wall hangings, light glass fixtures, and other fragile items prior to start of work. Any items in attic should be covered for protection from falling debris and dust. Contractor shall not be responsible for interior drywall cracks, nail pops or any damage to any items on the interior or the exterior of the home or work site including damage to tires of any kind, gutters, gutter guards, downspouts, shrubbery, outside plants, landscaping, yard furniture, decking, sprinkler systems, or driveways during the process of the work. Upon request from the Client, Contractor can assist in covering or removing these items. Upon completion of the work the property will be swept with a metal magnet and all debris associated with the work will be removed. Contractor cannot guarantee that loose nails will not be found by Client. Contractor will re-install any roof mounted antennas or satellite dishes unless otherwise directed by Client. Contractor will not be responsible for proper alignment or reception of same.
5.2 Contractor will NOT be responsible for any harm caused to pets from work being completed or work already completed which includes but is not limited to pets stepping on nails, or pets eating any type of debris. It is recommended but not required that Client should remove pets from the property. Pets sometimes do not react well to the loud noises of work being completed. Client is required to keep pets indoors or on a leash outside in an area that will not interfere with work being completed. Contractor will not be responsible for any pets getting loose and leaving the property. Client will be held liable for all medical bills if client's pet/pets cause harm to Contractor/workers in any way.
5.3 Any and all material brought to clients property belongs to the contractor until it is installed. That includes leftover material and any unused lumber.
6. TERMINATION
6.1 Client has the right to cancel this transaction without penalty or obligation within 3 business days of original signature date. Client can cancel agreement by email, text message, or in writing. To cancel this transaction via writing client can mail a signed and dated cancellation notice or any other written notice prior to midnight of the third business days from the original signature date to:
McDaniel Roofing, LLC
P.O box 2626 Chester, Virginia 23831
6.2 In the event Client decides to cancel this agreement more than 3 business days after the date of agreement any deposit given by client will not be refunded under any circumstances.
7. LIMITATION OF LIABILITY
7.1 CONTRACTOR SHALL NOT BE LIABLE FOR DAMAGES OF ANY KIND WHICH RESULT FROM FIRE, FLOOD, STRIKE, THIRD PARTIES, ACTS OF GOD, ACTS OF TERRORISM, OR BY ANY OTHER CIRCUMSTANCES WHICH ARE BEYOND THE CONTROL OF THE CONTRACTOR INCLUDING BUT NOT LIMITED TO SEVERE WEATHER.
7.2 CONTRACTOR’S LIABILITY FOR DAMAGES OF ANY KIND DUE TO BREACH OF WARRANTY, CONTRACT, ERROR, OMISSION OR NEGLIGENCE OR ANY TORT SHALL BE LIMITED TO A MAXIMUM OF THE TOTAL AMOUNT PAID TO CONTRACTOR UNDER THIS CONTRACT. UNDER NO CIRCUMSTANCES SHALL CONTRACTOR BE LIABLE FOR SPECIAL, INDIRECT OR CONSEQUENTIAL DAMAGES.
7.3 IN THE EVENT CLIENT DESIRES TO MAKE ANY CLAIM AGAINST CONTRACTOR, CLIENT SHALL PROVIDE CONTRACTOR WITH WRITTEN NOTICE OF THE CLAIM WITHIN SEVEN DAYS FROM THE DATE CLIENT, OR ITS AGENTS, FIRST DISCOVERS THE CLAIMS OR THE SAME SHALL BE BARRED. ANY CLAIMS AGAINST CONTRACTOR BROUGHT ON THIS CONTRACT OR IN ANY WAY ARISING OUT OF THIS CONTRACT MUST BE FILED WITHIN ONE YEAR FROM THE TIME THE CAUSE OF ACTION ACCRUED OR IT SHALL BE TIME BARRED.
7.4 UNDER NO CIRCUMSTANCES SHALL ANY EMPLOYEE, STOCKHOLDER, OFFICER OR AGENT OF CONTRACTOR HAVE ANY INDIVIDUAL LIABILITY TO THE CLIENT, NOTWITHSTANDING THE AFORESAID, IN THE EVENT ANY JUDGMENT IS ENTERED AGAINST ANY SUCH INDIVIDUAL, CLIENT AGREES TO LOOK EXCLUSIVELY TO THE ASSETS OF CONTRACTOR FOR SATISFACTION OF SAID JUDGMENT.
8. SEVERABILITY
In the event that any provisions herein shall be deemed invalid or unenforceable, the other provisions hereof shall remain in full force and effect and binding upon the parties hereto.
9. APPLICABLE LAW
If the Client is not a consumer, as defined in the Fair Debt Collection Practices Act, any claim arising out of or related to the Agreement shall be brought in the Courts of whichever county the location of work is located in Virginia and venue is proper there. This contract shall be interpreted, administered, and enforced in accordance with the Laws of the Commonwealth of Virginia.
10. MOLD DISCLAIMER
This contract does not include, unless explicitly specified, any mold abatement, removal, or cleaning. If mold is found existing on the premises, any cost to abate, remove, or clean shall be paid by client as an extra. In addition, any warranty given to you under this contract does NOT include the cost to abate, remove, or clean mold that may be found on the premises in the future.
11. VIRGINIA CONTRACTORS RECOVERY FUND
You have specific rights under the Virginia Contractors Recovery Fund. For information please contact:
Recovery Fund Office | DPOR
9960 Mayland Drive, Suite 400
Richmond, VA 23233
(804) 367-8500
E-mail: RecoveryFund@dpor.virginia.gov
http://www.dpor.virginia.gov/Boards/Contractors_Recovery_Fund/
Copyright © 2019 McDaniel Roofing LLC - All Rights Reserved.
Virgina State License #2705169859